The Sloe power plant in Vlissingen is not the first power plant we have worked on. In our history, we have contributed to the construction of most of the power plants in the Netherlands.
However, the construction of the Sloe power plant did take place within a very short time frame: in twelve months the power plant stood, in its striking shape and bright green colour. At the customer's request, we took care of the design, manufacture and on-site installation of the two units.
The steel structure for the main supporting structure, pipe racks, platforms, cladding, windows and doors consists of 2,600 tonnes of steel. The complexity of this project was in the simultaneous construction of interior and exterior: the processes had to be fully coordinated.